Connerton RLRB-A Budget Series Manuel d'utilisateur Page 2

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 4
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 1
2. Clearances And Ventilation:
Keep equipment area free and clear from combustibles.
3. Gas Piping:
Please note: air vent on regulator can plug with grease,
thereby shutting gas supply off. Install regulator in drip-free area.
ANSI Z21.69
ANSI Z21.41
IMPORTANT: Check all gas connections for leaks, using a soap and water solution.
DO NOT USE AN OPEN FLAME FOR CHECKING PURPOSES
4. Lighting And Relighting Of Broiler:
A.
B.
C.
D.
E.
5. Care And Maintenance:
Please Note: Contact factory before any warranty repairs are made.
A.
B.
C.
This broiler is designed for installation in non-combustible locations with 0
inch clearance from sides and back.
The area in front of, and above the broiler must be clear to avoid obstruction of flow of combustion and
ventilation air. Means must be provided for adequate air supply and adequate clearance for air
openings into the combustion chamber.
Adequate clearances must be provided in front and sides of the broiler for servicing and proper
operation.
It is important that the broiler be installed under an exhaust hood which is adequate to remove the
products of combustion and cooking vapors. Sufficient make-up air must also be provided to the
space where the broiler is located to replace that removed through the exhaust hood.
Make sure the gas pressure regulator supplied with the broiler is installed correctly.
Connect outlet side of regulator to broiler. The regulator is set at 4 inches w.c. on natural gas and 11
inches w.c. on propane gas. A 1/8” pressure tap is provided on the gas manifold at the front of the
broiler for checking the gas pressure.
Connect broiler to the gas supply line. Under no circumstances should the gas supply line be smaller
than the inlet pipe on the broiler. A gas shutoff valve must be installed in the gas supply line upstream
of the broiler for complete shutdown and service. Use pipe sealant on all pipe joints. Sealant must be
resistant to the action of L.P. gasses.
For proper performance, the broiler must be level. If legs are provided, adjust feet at bottom of legs to
level broiler. If legs are not provided, seal the base of the broiler to the countertop with silicone.
If the broiler is supplied with casters, the installation must be made with a connector that complies with
the Standard for Connectors for Movable Gas Appliances , and a quick-disconnect device
that complies with the Standard for Quick-Disconnect Devices for Use With Gas Fuel, .
Adequate means must be provided to limit the movement of the broiler without depending on the
connector and the quick-disconnect device or it’s associated piping to limit the broiler movement.
Restraining device should be connected to legs or back of body.
Turn all burner valves and pilot valves to “OFF”. Wait 5 minutes.
Turn on pilot valves and light pilots. Adjust flame height to approximately 1/2”.
Turn on burner valves to operate your broiler.
For complete shutdown, turn off all valves and the gas shutoff valve located upstream of the broiler.
To relight, repeat above procedures.
Contact factory, factory representative, or a local service company to perform maintenance and
repairs.
To clean top grate, use warm water, a mild cleanser and wire brush.
At least once per day, clean and empty grease pan.
Periodically, but not less than once every 3 months, clean burner orifices using warm water and wire
brush. Make sure equipment is cold before removing burners and orifices.
Vue de la page 1
1 2 3 4

Commentaires sur ces manuels

Pas de commentaire